Plot D2 Derby was a project completed for the contractors Bowmer + Kirkland.

The works on this site included a topsoil stripping, carrying out a cut and fill operation with lime modification of all fill material.

Then came an installation of 2 pond basins and importing 90,000 tonnes of stone to cap off the site.

Throughout the entirety of this project, our site managers and their teams faced varying weather conditions, and still produced the best results. That’s why our clients return to us time and time again, we not only have incredible machines and skills but also, incredible people working on our teams.