TKL Earthworks and Soil Stabilisation has earned a reputation for quality and reliability over the years. This has been achieved and retained by an ever increasing attention to planning, organisation, management and compliance in every stage of the contract, with the aim of giving total satisfaction to the client and their professional team.

A Total Package

TKL Eathworks & Soil Stabilisation has earned a reputation for reliability over the past 8 years in the construction industry, operating over a wide geographical area.

a proven track record

Our clients return to us on a regular basis, continuing to use us for our reliability and attention to detail. You’re dealing with the best in the business.

start to finish service

From initial estimation, dedicated site management and ground staff take your project through from start to completion, ensuring we are always there when needed.

the latest technology

We only use the best technology to give real-time information on your project by improving communication between our engineers/technical team and site foremen.

fully accredited

CHAS certified, Safe Contractor and Construction Line accredited. We know what we’re doing and have the documentation to prove it.

Our Recent Projects

With contracts ranging from £20k to £7.5 million for some of the most renowned construction firms in the country, planning, organisation, management and compliance are at the forefront of what we do. Take a look at just some of our recent projects.

Bowmer & Kirkland
Warrington, Omega

Value: £7.5 Million

Works included topsoil stripping the full site, a 150,000m³ cut and fill operation to achieve the required formation levels, alongside this we carried out ground stabilisation works to give a 200,000m² cement stabilised layer. Following this we imported Type 1 and 6F5 over building and external areas to finish off.

Bowmer & Kirkland
Forge Island, Rotherham

Value: £1.5 Million

Works included carrying out a 55,000m³ made ground turnover to remove all obstructions, the disposal and treatment of any contaminated materials and the screening and crushing of 35,000m³ to a 6F2 and Type 1 spec for reuse on site.


Bowmer & Kirkland
Plot D2, Derby

Value: £6 Million

Works included topsoil stripping, carrying out a 70,000m³ cut and fill operation with lime modification of all fill material, the installation of 2 pond basins and importing 90,000 tonnes of stone to cap off the site.

Newline
Mastin Moor

Value: £400,000

Works started off with a topsoil strip to the full site, then followed by a 50,000m³ cut and fill operation to achieve required levels. After this we re-instated topsoil to all landscape and public open space areas.

C3 Construction
Bestwood, Nottingham

Value: £700,000

Works included topsoil stripping the site and removing any trees or bushes. We then carried out a cut and fill operation while placing a clean capping system across the fill site, before reinstating topsoil to the landscape and public open space areas.

Bowmer & Kirkland
Florence MacWilliams Academy, Stoke

Value:

Works started off with a 25,000m³ topsoil strip to stockpile on site for future re-use. After a 23,000m³ cut and fill operation took place to achieve formation levels which included stabilising any fill levels to achieve the spec. Then stabilised haul routes were put in place across site to help with progress through the winter months.